Skip to main content

Commercial buildings

URETEK have stabilized and lifted floors in many commercial buildings around the world.

Projects

THE RAISING OF A SUPERMARKET FLOOR OUTSIDE OPENING HOURS

The Supermarket had operated for 3 years in the property. During these 3 years subsidence problems has occurred, which caused problems especially for the forklifts, the customer carts and oblique product shelves.

Stabilization, lifting and re-levelling of a factory floor, West Country UK

URETEK stabilized and lifted factory flooring in a West Country industrial facility with racking up to 90ft high.

Full use of the storage capacity due to URETEK solutions

Empty gaps were found to be present under the floor of the storage space of an international retail department store chain due to compaction of the soil

3000M² OF FLOORS WERE RE-LEVELLED WITH NO DISRUPTION TO DAILY BUSINESS

The popular hypermarket, K-Citymarket, in Jämsä (located in Central Finland) had experienced challenges as a result of uneven floors shortly after it was built in 2008.